|

Subfloor moisture problems are a thing of the past - Install floor coverings after 24 hours save as much as 4 Months
Creates a DEEP - THICK - COMPLETE and PERMANENT Moisture Barrier
MOISTURE-FIX 1
Moisture Barrier for any adhesive fixed floorPenetrates to extraordinary depths permanently.
- formulated for the Flooring Installer/Contractor
- easy and simple to apply
- single pack (no mixing)
- deeply penetrates
- permanent moisture and vapour barrier
- withstands hydrostatic pressure
- extremely long shelf life
- user friendly environmentally safe
- zero VOC odourless
MOISTURE-FIX 2 Moisture Barrier for Batten Fixed & Floating Timber floors, loose laid carpet & vinyl and for carpet tiles fixed in pressure sensitive adhesive.
Moisture-Fix 2 is used when flooring, in particular Timber, is not glued to the subfloor. Shoot as many nails or charges into this Moisture-Fix 2 as you like, you will not compromise its effect or function. Moisture-Fix 2 creates a barrier not just thinly on the surface of the subfloor but deeply, thick, complete and permanent. Moisture-Fix 2 has a top as well as the normal internal barrier to give extra protection with moisture sensitive timber products. Moisture-Fix 2 has inbuilt protection ensuring your client a clean, hygienic, mould and odour free subfloor. Moisture-Fix 2 is as easy to apply as Moisture-Fix 1. Simply pour and spread with a broom. Safe, easy, quick and guaranteed to work.
Benifits of Moisture Fix that save you MONEY:
- On new and old concrete
- Fast Safe and Clean
- Minimum downtime
- Walkable in 1 hour
- Install floor coverings after 24 hours save as much as 4 Months
- No Mixing - 5 year + shelf life
- Withstands hydrostatic pressure
- Simply Pour and Spread

User Friendly - Non Toxic - Non Flammable - Zero VOC - Environmentally Safe - Odourless Manufacturers of the world’s most technically advanced systems for permanent concrete repair, moisture proofing and protection treatments. CONCRETE MOISTURE PROOFING SOLUTION - PERMANENTLY MOISTURE PROOFS AND IMPROVES NEW OR OLD CONCRETE LAY FLOOR COVERINGS IN 24 HOURS NOT MONTHS
|
|
Last Updated on Thursday, 25 February 2010 00:25 |